The Journey of the Vito Deep-Water Development
Tuesday, 2 May
604
Technical / Poster Session
The Vito project, in the US Gulf of Mexico, was designed to develop deep-water resources competitively through simplified design, collaboration with suppliers, and leveraging industry practices. This session tells the improvement story across multiple disciplines from drilling and SURF through host and export. The importance of minimal technical scoping and integration across the contract partner landscape will be highlighted.
Chairperson
Sponsoring Society:
- American Society of Civil Engineers (ASCE)
-
1400-1418 32414Vito Project: Drilling and Completions - World Class Riserless Batch Set Performance, Best-In Class Deepening Performance, In-Well Barrier Gas-Lift System, 17 Ksi Barrier Checks, 15 MMSCF/Day Injection Rate
-
1420-1438 32318Vito Project: Subsea System Goes Back to Basics
-
1440-1458 32518Vito Project: Designing a Simple, Light-Weight, Single Lift Topsides
-
1500-1518 32503Vito Project: Hull / Mooring Design and Platform Installation
-
1520-1538 32462Vito Project: Host Construction and Commissioning
-
1540-1558 32261Vito Project: A Case Study Between a Development Operator and Pipeline Operators Advancing Deep Water Together
-
1600-1618 32496Vito Project: Operating Model and Start-Up Ramp Up (SURU)
-
Alternate 32319Vito Project: Vito Field Development
-
Alternate 32254Vito Project Overview